ALMATY 1 - SHU 110 KM (2015-2017)
Scopes of structural works: - a scope of earth works – 753,669 thou. m³ - bedding of main and station tracks using the crushed stone – 354 thou. m³ - installation of sand blanket – 418 thou. m³ - artificial structures, extension of concrete pipes – 48 pcs.; - bottom pipes – 6 pcs.; - 2 minor bridges with a length of up to 5 meters, 10 interim bridges with a length of up to 100 m, 2 over bridges
-
ALMATY - KAPSHAGAY 8 KM (2014-2016)
Almaty-Kapshagay section of the Almaty – Ust-Kamenogorsk road, 45-53 km section from 45-77 km, technical grade I, 6 lanes
-
DRY PORT (2015-2016)
Complex works for construction of the Dry Port and infrastructure facilities in the Khorgos-East Gate Special Economic Zone
-
ZHETYGEN – KHORGOS 293 KM (2010 - 2012)
Draft program of forced industrial-innovation development of the Republic of Kazakhstan. Transport corridor between Europe and Asia. Laying of road bed – 18,747 thou.m³. 5 stations, 9 sidetracks, 28 bridges and 2 over bridges have been constructed. 120 pipe culverts.
-
ARKALYK – SHUBARKOL 214,4 KM (2012 - 2016)
Scopes of structural works: 41 reconstruction facilities; laying of road bed – 13,360,760 m³, 8 bridges with a length of between 34.5 m and 102.6 m; construction of pipe culvert – 122 pcs.; facilities of longitudinal electric power supply, fiber-optic links, signaling, centralisation, blocking and communication, 2 connecting stations, 5 operation points.